We use cookies to ensure our site functions properly and to store limited information about your usage. You may give or withdraw consent at any time. To find out more, read our privacy policy and cookie policy.
Manage Cookies
A cookie is information stored on your computer by a website you visit. Cookies often store your settings for a website, such as your preferred language or location. This allows the site to present you with information customized to fit your needs. As per the GDPR law, companies need to get your explicit approval to collect your data. Some of these cookies are ‘strictly necessary’ to provide the basic functions of the website and can not be turned off, while others if present, have the option of being turned off. Learn more about our Privacy and Cookie policies. These can be managed also from our cookie policy page.
Strictly necessary cookies(always on):
Necessary for enabling core functionality. The website cannot function properly without these cookies. This cannot be turned off. e.g. Sign in, Language
Analytics cookies:
Analytical cookies help us to analyse user behaviour, mainly to see if the users are able to find and act on things that they are looking for. They allow us to recognise and count the number of visitors and to see how visitors move around our website when they are using it. Tools used: Google Analytics
Share Chalkwell Ramp - Have your Say on the design on FacebookShare Chalkwell Ramp - Have your Say on the design on TwitterShare Chalkwell Ramp - Have your Say on the design on LinkedinEmail Chalkwell Ramp - Have your Say on the design link
At the first public meeting, there was an opinion poll on ramp design options. The three favourite options were chosen. The preliminary designs are now ready for a public vote.
Key points:
Each option includes steps, a ramp and a viewing platform
Current Network Rail land boundaries means the ramp will be in a different position. The new ramp will exit south from the existing brick pier. This means we can complete future maintenance and will not need Network Rail’s permission every time.
Accessibility guidance has significantly changed since the original ramp was built in 1910. This means that the new ramp will be longer than the old ramp.
Changes to the current primary and secondary sea defences will be required for each of the new options.
Option 1:
Circular spiral, similar to nearby Gypsy Bridge.
No ‘stepped’ ramp
Should allow installation whilst the temporary ramp / steps remain
Option 2:
Tear-drop shaped spiral
Should allow installation whilst the temporary ramp / steps remain
Option 3:
Traditional ramp shape
Replicates the previous Chalkwell Ramp
Designed to meet current accessibility guidance
Temporary ramp / steps will need to be removed before installation
The 3D images and technical drawings for each design option are viewable in the photo collection.
Please email any further comments to consultations@southend.gov.uk
At the first public meeting, there was an opinion poll on ramp design options. The three favourite options were chosen. The preliminary designs are now ready for a public vote.
Key points:
Each option includes steps, a ramp and a viewing platform
Current Network Rail land boundaries means the ramp will be in a different position. The new ramp will exit south from the existing brick pier. This means we can complete future maintenance and will not need Network Rail’s permission every time.
Accessibility guidance has significantly changed since the original ramp was built in 1910. This means that the new ramp will be longer than the old ramp.
Changes to the current primary and secondary sea defences will be required for each of the new options.
Option 1:
Circular spiral, similar to nearby Gypsy Bridge.
No ‘stepped’ ramp
Should allow installation whilst the temporary ramp / steps remain
Option 2:
Tear-drop shaped spiral
Should allow installation whilst the temporary ramp / steps remain
Option 3:
Traditional ramp shape
Replicates the previous Chalkwell Ramp
Designed to meet current accessibility guidance
Temporary ramp / steps will need to be removed before installation
The 3D images and technical drawings for each design option are viewable in the photo collection.
Please email any further comments to consultations@southend.gov.uk
Chalkwell Ramp - Have your Say on the design is currently at this stage
This consultation is open for contributions.
Under Review
this is an upcoming stage for Chalkwell Ramp - Have your Say on the design
Contributions to this consultation are closed for evaluation and review. The project team will report back on key outcomes.
Final report
this is an upcoming stage for Chalkwell Ramp - Have your Say on the design
The final outcomes of the consultation are documented here. This may include a summary of all contributions collected as well as recommendations for future action.